OPPYRequest access

For investors

OPPY is designed to win where affordability, replaceability, range, and field usefulness matter most.

Designed for fleet economics: low target price class and replaceability matter in attrition-shaped environments.

Ground payload and range address missions that small drones cannot carry.

REEV plus battery swap reduces downtime versus pure battery dependence.

GPS-denied navigation is treated as a core requirement, not a later feature.

Dual-use production can help reduce defence-only cold-start economics.

CapabilityCrewed ResupplySmall DronesPremium UGVsOPPY Target
Removes personnel exposureNoYesYesYes
300 kg ground payloadYesNoOftenYes
Fleet-scale affordabilityLowMediumLowHigh
Long mixed-mode rangeHuman dependentLimitedVariableCore target
GPS-denied resilienceHuman dependentVariableVariableCore target
Civilian scale pathNoLimitedLimitedYes

Useful autonomy + rugged utility + low cost = scalable last-mile logistics.

Startec brings relevant DNA: smart mobility, rugged testing, cost discipline, and partner-led commercialization.

Startec Intelligent publicly centers on connected safety systems: SOS emergency response, keyless ignition, geo-tracking anti-theft, traffic detection, smart display, AI, and OTA upgrades.

Public positioning targets cost-sensitive, high-volume light-vehicle markets in developing regions.

Calypso Motors partnership creates a practical installation, testing, and market-feedback pathway in Cambodia.

R&D references include University of Calgary Life Sciences Innovation Hub / Innovate Calgary.

Team mix spans motorcycle industry experience, AI/ML, mechatronics, project execution, marketing, and investor relations.

Capability bridge

  1. Startec Intelligent
  2. connected vehicle safety
  3. rugged smart mobility
  4. autonomous utility platform
  5. OPPY

A smart motorcycle system is not the same as a defence UGV, but it does show useful ingredients.

The next milestone is field evidence, not a bigger story.

  1. 0–3 months

    Gate 1: Can it be built?

    Requirements lock, BOM, prototype architecture, partner plan

    Proof created

    Buildable spec and credible cost model

  2. 3–9 months

    Gate 2: Can it carry?

    Alpha build: payload, drivetrain, REEV, battery swap, basic autonomy

    Proof created

    Physical prototype and integration proof

  3. 9–15 months

    Gate 3: Can it navigate?

    Field tests: follow-me, resupply shuttle, CASEVAC mock, field power

    Proof created

    Mission evidence and reliability data

  4. 15–24 months

    Gate 4: Can it be bought?

    Defence pathway + civilian pilots

    Proof created

    Procurement readiness and commercial signal

Validation metrics

  • payload performance over representative terrain
  • range, duty cycle, and refuel
  • battery-swap time
  • autonomous or supervised mission completion rate
  • GPS-denied navigation performance
  • field repairability and maintainability
  • pilot conversion and procurement-path evidence

We are building the proof package for dual-use autonomous logistics at fleet economics.

Seeking investment and funding partnerships to advance OPPY from concept to prototype and field validation.

Seeking government defence innovation / industrial-development pathway discussions.

Seeking technical validation guidance on qualification standards, mission requirements, and test design.

Seeking early pilot partners across defence, agriculture, forestry, parks, remote operations, and emergency power.

Use of funds

  • Prototype engineering and build
  • Autonomy and GPS-denied navigation development
  • REEV / battery swap / field-power integration
  • Field testing and mission demonstrations
  • Supply chain, manufacturability, and program-path execution

OPPY is for investors who believe autonomous logistics will be won by platforms that can be deployed, lost, repaired, and replaced at scale.

Next step

If this is worth exploring, the next useful step is a technical and investor diligence session around prototype budget, build partners, IP ownership, validation gates, and first pilot targets.

Request a diligence session